Waste To Energy
Waste Solutions has specialist expertise in the design and implementation of anaerobic digestion processes to convert the energy content of solid and liquid waste to renewable energy in the form of biogas.
The reactor is being filled.
Facility Entrance.
Local construction team.
Dr. Chris Hearn (Senior Biotechnologist) and Germain Robin (Asia Region Manager).
 
 
 
~1.1 Mb

KS Bioplus, Kalasin, Thailand

Thailand

At more than 9 football fields in area this is the largest anaerobic digester in the world. The Cigar® is sized to allow for factory expansions and futureproofing their energy needs. Early production of around 96,000m³ biogas per day will provide the energy to dry the starch as well as generating 4MW of electricial energy.

Client: Kalasin Flour Co Ltd Size: 79,000m³ wastewater per day
Location: Krabi, Thailand Value: USD 3.6 Million
Gas blowers.
Wastewater Mixing Tank.
Pressure Transducer.
Compressor Facility.
 
 
 
~1 Mb

Chao Khun Agro (CKA), Saraburi, Thailand

Thailand

This Cigar® CARB facility processing cassava fructose syrup waste was opened in late 2006. The Cigar® replaced a failed tank based anaerobic digestion system. The biogas generated is used to provide heat for the syrup processing, avoiding the use of 6.6 million litres of heavy fuel oil per year and to generate 1.3 MW of electrical power which is enough for 96% of the factory's electricity use.

Client: Thai Bio-Energy Company Size: 3,000m³ wastewater per day
Location: Krabi, Thailand Value: USD 2.25 Million R.O.I 26 months
Containerised pilot plant on site in the Netherlands.
Pilot plant switchboard.
Pilot plant reactor controls.
Pilot plant heat exchanger
 
 
 
~412 kb

Pilot Plants A & B, Netherlands

Netherlands

Starch production for energy is very profitable and this custom built pilot plant in the Netherlands is at the forefront of our research efforts to enhance environmental energy technologies. We are looking forward several major projects to go ahead in the Netherlands and the UK.

Client: Confidential Size: Containerised Pilot Plant
Location: The Netherlands Value: Ongoing Contracts (withheld)
Camellia, Sydney, Australia: A large commercial venture designed to recover energy and fertiliser from 51,000 tonnes/year of food wastes from supermarkets, restaurants and food industries.
The facility generates approximately 3.0 MW of electrical energy.
Switchboard
High quality organic fertiliser
 
 
 
~465 kb

Camellia, Sydney, Australia

Australia

A large commercial venture designed to recover energy and fertiliser from 51,000 tonnes/year of food wastes from supermarkets, restaurants and food industries. The facility generates approximately 3.0 MW of electrical energy while utilising the waste heat to produce high quality organic fertiliser.

Client: Camellia Waste to Energy Size: 2 x 5,000m³ Anaerobic Reactors
Location: Sydney, Australia Value: AUD 30 Million
Jiratpattana, Thailand: This Cigar® CARB facility processing starch waste opened in mid 2006...
...and runs two 0.5MW generators as well as providing the nearby factory with biogas.
Influent wastewater
Biogas extraction system
 
 
 
~211 kb

Jiratpattana, Thailand

Thailand

This Cigar® CARB facility processing starch waste opened in mid 2006, and runs two 0.5MW generators as well as providing the nearby factory with biogas. Like with most other projects the facility has fully automated operations and remote performance monitoring via the Cigar® CONTROL system.

Client: Thai Biogas Company Size: 3,500m³ wastewater per day
Location: Kalasin, Thailand Value: USD 3.1 Million R.O.I. ~ 36 Months
Khorat, Thailand: At the time of commissioning this was the largest anaerobic digester in the Southern Hemisphere.
This facility produces more than 90,000m³ biogas per day from the daily discharge of more than 7,000m³ high strength wastewater from processing Cassava root.
The biogas replaces 7 million litres of heavy fuel oil per year...
...and it also fuels an electricity generation plant that provides more than half of the power needs of the nearby plant which produces 750 tons of native starch per day.
 
 
 
~139 kb

Khorat, Thailand

Thailand

At the time of commissioning this was the largest anaerobic digester in the Southern Hemisphere. This facility produces more than 90,000m³ biogas per day from the daily discharge of more than 7,000m³ high strength wastewater from processing Cassava root. The biogas replaces 7 million litres of heavy fuel oil per year and it also fuels an electricity generation plant that provides more than half of the power needs of the nearby plant which produces 750 tons of native starch per day.

Client: Khorat Waste to Energy (KWTE) Size: 7,000m³ wastewater per day
Location: Khorat, Thailand Value: USD 5.0 Million R.O.I. ~ 18 Months
Kitroonruang Waste to Energy, Thailand: This Cigar® CARB facility is successfully treating Cassava waste.
The digester was designed to process 2,800m³ wastewater per day, with an average organic load of 15,000mg/l COD,...
...and produce 24,000m³/day of biogas used for factory process heat...
...and to generate 1.3 MW, of electrical energy from a Jenbacher generator.
 
 
 
~372 kb

Kitroongruang, Map Ta Phut, Thailand

Thailand

This Cigar® CARB facility is successfully treating Cassava waste. The digester was designed to process 2,800m³ wastewater per day, with an average organic load of 15,000mg/l COD, and produce 24,000m³/day of biogas used for factory process heat and to generate 1.3 MW, of electrical energy from a Jenbacher generator.

Client: Thai Biogas Company Size: 2,800m³ wastewater per day
Location: Map Ta Phut, Thailand Value: USD 3.1 Million R.O.I. ~ 24 Months
Lampung Bekri, Sumatra, Indonesia...
Treating waste from 22,000 head of cattle.
Initially the project will generate revenue from CDM's only but there will likely be an investment into a Genset in the future.
Biogas production is expected to be around 8,000m³ per day.
 
 
 
~359 kb

Lampung Bekri, Sumatra, Indonesia

Indonesia

Treating waste from 22,000 head of cattle. Initially the project will generate revenue from CDM’s only but there will likely be an investment into a Genset in the future. Biogas production is expected to be around 8,000m³ per day.

Client: EcoSecurities Indonesia Size: 800m³ wastewater per day
Location: Sumatra, Indonesia Value: USD 1 Million
Semino, Santa Fe, Argentina
Existing wastewater ponds to be used as polishing ponds.
Gerardo Luna is inspecting the site prior to construction.
 
 
 
~300 kb

Semino, Santa Fe, Argentina

Argentina

This is the first of many plants in a new market for us. Our new office in Salta, Argentina is fielding a lot of interest.

Client: Semino Size: 2,200m³ wastewater per day
Location: Santa Fe, Argentina Value: Ongoing Contract (withheld)
Siam, Krabi, Thailand: A Cigar® HiGREASE treating Palm Oil Mill Effluent processing more than 11,000m³ biogas per day and generating 1MW of electrical energy.
Excess gas is flared for CDM revenue.
Gas production is exceeding expectations with potential for additional electricity generation.
 
 
 
~219 kb

Siam, Krabi, Thailand

Thailand

A Cigar® HiGREASE treating Palm Oil Mill Effluent processing more than 11,000m³ biogas per day and generating 1MW of electrical energy. Excess gas is flared for CDM revenue. Gas production is exceeding expectations with potential for additional electricity generation.

Client: Univanich Size: 360m³ wastewater per day
Location: Krabi, Thailand Value: USD 1.6 Million R.O.I 24 months
TAE Lanna, Thailand: A Cigar® CARB. Aerobic post treatment SBR.
This facility treats 200,00 COD Ethanol distillery waste.
The project was technically demanding but has proven to be very robust.
Excess gas being flared to destroy greenhouse gases.
 
 
 
~807 kb

TAE Lanna, Dan Chang, Thailand

Thailand

A Cigar® CARB facility processing the stillage from a Molasses distillery producing transport ethanol. The plant produces boiler fuel and wastewater suitable for irrigation. The project was technically demanding but has proven to be very robust and copes well with an incoming waste strength which is twice the concentration of COD it was originally designed for. The facility produces 28,000m³ biogas per day.

Client: TAE, Thai Agro Energy Size: 1,450m³ wastewater per day
Location: Dan Chang, Thailand Value: USD 2.25 Million